The devil is always in the details and this project has been no exception. There were some typos on the plans that caused the basement to be built 6 feet too short. (Whups) Fortunately the basement subcontractor and the general contractor came to an understanding in seconds and the error corrected with incredible speed. Had I not actually gone out there when the basement walls were being framed, I think I would have missed it completely.
Here is a pictorial representation of the process as it has gone along so far. Click on any picture to get a larger image. Note that most larger images have a date stamp on them. This will give you an idea of time it takes to complete each phase.
| Basement |
Digging |

First Scoop
|

Big hole
|
|
|
| |
Wall Construction |
 Footers
|
 Wall Forms
|
 Leaking Concrete
|
 Finished Walls
|
| |
Basement Framing |
 Poured floor
|
 Entertainment Cntr
|
 Bedrooms/Bath
|
 Backfilled
|
| Main Floor |
Framing Start |
 Garage
|
 Main House
|
 Front Entry
|
 Porte Cache Pillars
|
| |
|
 Back of House
|
 Back of Garage
|
 Garage/Workshop
|
 Porte Cache/Library
|
| |
|

Columns & Arches on Patio
|
 View from front of house standing on roof
|
 Porte cache drive-through
|
|
| |
Framing Wrapup |
 Framing Completed, Interior work begun
|
|
|
|
| Interior Details |
Main house |
 Foyer ceiling in entry
|
 Library ceiling
|
 Stair landing w/ furring strips
|
 Master bath glass block glass walls
|
| |
Dumbwaiter |
 Dumbwaiter buildout in pantry
|
 Dumbwaiter motor assembly
|
|
|
| |
Structured wiring |
 Structured wiring home run panels in office closet
|
|
|
|
| |
Garage Workshop |
 Duplex outlet detail--separate circuits to top and bottom outlets.
|
|
|
|
| |
Insulation |
 Batting for hard-to-reach places
|
 Blown cellulose for everywhere else
|
|
|
| |
Drywall |
 Covering the walls
|
 Circular stairwell
|
 Taping the hung Drywall
|
 Glad I don't do this!
|
| |
Cabinets |
 Start of kitchen cabinet install
|
 Two islands, base and upper units
|
 Left unit for ovens, microwave
|

Doors Installed |
| |
|

Base Unit Doors
|
|
|
|
| |
Countertops |

Granite countertops--"Paradisio Classico"
|
 This one weighed 800 pounds...(!)
|
 New house syndrome starts to form.
|

Backsplashes Added
|
| |
|

Digging out a switch thru granite and drywall.
|

Kitchen columns installed |
|
|
| |
Floor Tiles & Flooring |
 Initial delivery of tile
|
 Floors start to take shape
|
 Starburst pattern for entryway
|

Library floor (cherry) |
| |
Lights |

Entry Light |

Dining Room Light |
|
|
| Exterior Progress |
Windows |
 Windows in!
|
|
|
|
| |
Siding |
 Styrofoam insulation on outside applied.
|
 Library w/ main electrical panel
|
 Patio with foam applied
|
|
| |
Doors |
 Door style for exterior doors
|
 French doors on back Patio
|
|
|
| |
Roof |
 Staging of roof tiles prior to installation
|
 Another job for the young.
|

Thought we'd blown the color, but was just dirty tile!
|
|
| |
Stucco |

They put an initial ("scratch") coat on.
|
 Then finish it with the final one.
|
|
|
| |
Paint |
 Anguished decision.
|
|
|
|
| |
Lights |

Front Entry lights
|
|
|
|
| |
Back |